 |
NJ Kitchen Remodeling
Services:
A-Z perform complete NJ kitchen remodeling. The firm will handle all
aspects of the remodeling project (from A to Z). The process will begin
by obtaining the necessary permits from the town hall. Upon obtaining
the permits , the work will begin according to the following schedule
(see bellow)
Demolition - The company will order dumpster and provide the homeowner
with safe demolition services. The demolition process is not a complex
task. However, it must be done with caution in order to avoid any damage
to electric or plumbing. A proper disconnection of the electric and/or
plumbing is needed prior to the demolition.
Framing - This stage is usually optional. In other words, A-Z team will inspect the existing structure for any flows
and correct them. In some extreme cases , our team will replace the
entire structure. We understand that homeowners are not looking to spend
money on their home but rather to invest in it. Therefore, we want to
look to ensure that we build to last.
Insulation - This stage may also be optional. In the newer homes , an
insulation may already be in place and in good condition. In the older
homes , insulation should be applied in order to pass the building
inspection.
Plumbing - This stage involves the preparation the drainage pipes ,
waste pipes and hot/cold water supply pipes for all the fixtures such:
sink, dishwasher, refrigerator and garbage disposal.
Electric - This stage involves an installation of outlets in the
backsplash (every 4 FT according to code requirement) , a homerun for
the dishwasher , hot connection for the oven or stove, cook-top
installation and installation of recessed lights or low-voltage lights.
Sheetrock - supply and installation of sheetrock and performing the
needed compound work.
Paint - Painting all uncovered areas using flat or semi-gloss paint.
Tiling the kitchen floor - In this stage our company team will discuss
the floor design options with the homeowner. Once a decision is reached
we will either supply the tiles or assist the homeowner with getting a
discounted price on the tiles of his/her choice.
Cabinets - This stage involves the design of kitchen cabinets layout /
floor plan using 20-20 design software, the supply of ALLWOOD kitchen
cabinets and the installation of kitchen cabinets. The homeowner may
choose to order kitchen handles and kitchen knobs. In such case , our
company will install the hardware.
Countertop - Our company will supply the material (slab) , fabricate the
top with selected edge, and finally install the top. The installation of
kitchen countertop may seem like an easy task. In reality , the
installation of countertop is very dangerous task both in terms of human
injury and product damage. Further, improper handling of kitchen
countertop may cause a serious injury for the installer or in more
fortunate case significant damage to the countertop.
Backsplash - The backsplash is the final piece in the puzzle. The
homeowner may select from few options-- ceramic tile , tumble marble
tile and or granite backsplash (also called full backsplash). Our
company specialized in Artistic Backsplash Installations. Ask our
salesperson for see samples of previous projects.
Touch Ups - This stage involves correcting any small , unfinished and/or
unseen details till the homeowner is fully satisfied. |